Consultation

After the successful adoption of the idea to build a skate park, it's time for consultation on the location and components. It is possible that such a meeting will be to arrange a representative of one of the companies that builds skateparks and immediately, using the on-site program and the projector, the formation of the initial concept of the park. Such a design can be so good and corresponds to all that the end-thin sections as fast may lead to completion. But it can also be a starting point for further changes - important as soon as possible to determine at least the skeleton of the elements that are sure to find a skate park, and a whole still does not change that unnecessarily prolong the case. Eventually, the company designing and building skateparks can prepare any suggestions parks such as 2 or 3 to choose from.

On consultation and the design should pay attention to a few things and find out:

1st Who will ride: skateboarders, skaters, cyclists and everyone else?
2nd What elements must be included in the skate park, which will be optional? You can set a list (order of priority).
3rd How many of the skatepark, which is the size of the square?
4th Will it be a new square and can be adapted for a skatepark?
5th As this is an existing play what is the surface (preferably concrete)?
6th Where is this place? Are not 50 meters from the house? Because if so it will be complaints from residents of the noise (the minimum reasonable distance from residential buildings to 200m).
7th What technology will skatepark?
8th Will purchase only items that will be greater investment such as square + items? In the second case, if it is built to a larger object will need a building permit and other documents. Then for the job to hire the best design firm with experience in designing skateparks such as MODUS.
9th Before designing a good knowledge of how indicative budget City / Municipality wants to spend the skatepark to the design of the designer's imagination and youth too developed. The company must prepare a cost estimate and because it may be that the skatepark VALUE IS GREATER THAN ASSUMES THE CITY / TOWN. In this case, the city does not lack the money and build a skate park (and for this example, the money will be lost in the next financial year).
10th Having established the concept of the park, we necessarily must prepare skatepark design performance specifications, for example has not proved that the park will be covered with plastic, nailed with nails, etc.
11th It is very important for the design and subsequent construction of the experience of the contractor - references, the quantity and quality of our skateparks.

Consultation with young people is very important. This is because they will go, so they know best what obstacles should be placed in the skatepark.